All American Pro Painting and
 Deck & Dock Restoration
910-250-0133
HomeAbout UsServicesPhoto GalleryContact Us

Contact Us
All American Pro Painting and Deck & Dock Restoration Gallery
Here are some examples of our latest work. 
Please contact us with your specific requests, and we will prepare a free estimate.
Or for more information, call us at:  910-250-0133

Or send inquiries to:
   3611 Ashley Cir
   Wilmington, NC 28405
Home Owner: Dillion
Services Rendered: Pressure Wash, Paint Hardy Board, Paint Soffits, Paint Trim, Paint Doors.
Paint Used: Valspar
Dillion and his wife had just had Hardy Board put up and wanted it painted to match the rear of the house as well as the trim and doors painted as well.
Total time from start to finish: 3 days
Method used: Roller and Brush

Home Owner: Mr. Clemmons 
Services Rendered, Pressure wash, wood fill and paint.
Paint used: Deck Over and Sherwin Williams Duration.
Total time start to finish: 2 days
Home Owner: Kevin
Services Rendered: Total Restoration, repair and sand interior and exterior, hardy board hung, sheetrock repair, decking restoration & painting. Interior and exterior painting, pressure washing. 
Time from start to finish: 4 Weeks
Paint Used: Sherwin Williams Duration, Super Deck.

Home Owner:
Services Rendered: Pressure Washing, Wood rot repair, Exterior Painting, Screen Poarch Restoration
Paint Used : Sherwin Williams Duration
Total Time From Start To Finish: 4 Days
Method Used: Spray, Roller, and Brush Trim
Before (Above)
After (Above)
Home owner Mrs. Edna
Service: Pressure Wash: Deck, House, Driveway and walkways 
Paint Deck and Rails, Paint Exterior Trim
Paint Used Rustolum Restore
The 92 Year old Mrs.Edna wan really in a bind. After getting quotes of over $4000.00 to re do her decks, Mrs. Edna called All American Pro. We saved her thousands and gave her exactly what she wanted! 
Home Owner Wen Suns Realty
Services Rendered: Pressure Washed Exterior, Cedar Shake, Paint Interior, Ceilings Repaired and Painted, Drywall Repair, New Walls Framed and Built, Doors and Door Frames Installed, Deck Restored and Painted, Landscaped, Wall Paper Removed and Installed, Chair Rails and Picture Frames Installed, Subflooring Installed, 
Home Owner: Jenny
Service Rendered: Stain Pergola
Product Used: Sherwin Williams Deckscape Semi Transparent Color Crossroads

We built this closet and installed the bi folds.
Before
After
Home Owner Mr. York
Service Rendered: Prep and Paint Exterior Trim, Cedar Shake, and Concrete Caps. Replace composite wood siding with James Hardie Plank and Paint.
Time Frame: Total days 8
Method Used: Spray, Roll, and Brush.


Location Ashleigh Shores Apartments
Tenant Steve
Service: Paint Textured Walls 
Paint Used Sherwin Williams Super Paint Flat
Total Time: 2 days
Before 
Before
Customer Mrs. Carrol
Services Rendered= Total Restoration, Paint, Flooring installed, Carpentry work, Door casings replaced/repaired, Shoe molding installed, Drywall repair, Pressure washing, Cabinet restoration, Ceiling fan installation, Faucet and toilet replacement, Exterior Painting.

This was a rental property that was totally trashed by the tenants and their pets for 5 yrs. The carpets were urine soaked and ripped up by the pets. Every door casing had been chewed up by the dogs. The Cabinets were also chewed up. The walls were also severely damaged by the pets and grease. The linoleum was completely chewed up. After a total tear out, we germicidally cleaned the entire property from top to bottom. Then the entire interior was prepped and painted. The damaged trim was completely torn out and replaced. The cabinets were sanded and repaired and after five coats of priming and custom painting. New ceiling fans were installed. The linoleum was replaced in the bathrooms as well as replaced rotted base boards. New snap laminate flooring was installed throughout the entire house. The bathroom faucets and toilets were replaced due to existing damage.
Completion Time 8 days




After
After
Before
After.
Before
After
Before
After
Before
After
Home Owner: Scott
Job: Paint Exterior Trim, Paint Exterior Body, Stain Deck
Paint Used: Sherwin Williams Emerald
Time Frame: 8 Days
Location: Seawatch Way Kure Beach
Carolina Beach Condos
Paint Siding , Rails, Pickets, and Exterior Ceiling 
Time frame 4 days

Deck Restoration
Paint Rails and Pickets Sherwin Williams Superpaint
Deck Boards Duck Back Super Deck With Crushed Walnut Additives 
Time frame 2 days
Paint Exterior and Trim
Repair Rot
Paint Used Sherwin Williams Duration
Time Frame 7 Days
​Marsh Oaks 
Customer Mrs. Carrol (Becky's House)
Job This was an unfinished attic. We hung the sheetrock, PVA primed and painted, cut trim and shoe molding
Time Frame: One Week
Paint Used Sherwin Williams Pro Mar 100, Kilz PVA Primer

Before 
After
Customer Saffo Construction
Job Paint interior office spaces and ceilings and exterior. Used an exterior metal 2 part epoxy primer. 
Paint Used: Sherwin Williams Super Paint Extterior Satin, Super Paint Flat Interior, Gliddin ceiling Paint, Super Paint exterior gloss
These pictures are of the exterior work still in progress.
Customer Mrs Marsha
Job. Paint interior, Sheetrock Repair, Popcorn Removal, Wall Paper removal
Paint Used - Sherwin Williams Super Paint Flat, Sherwin Williams Master Hide (ceilings) Sherwin Williams PVA primer
Job Pressure Wash, Prep caulk, rust inhibitor, Paint Trim, and Siding 
Paint Used- Sherwin Williams Super Paint Exterior Flat, Sherwin Williams Exterior Gloss
Customer The Livery
Job Prep, Oil Base Prime and Paint Trim, Paint Walls, Texture Ceiling Repair, Stain Block, and Paint Ceiling
Product Super Paint Interior Flat, Zinsser Oil Base Primer, Sherwin Williams Super Paint semi gloss, Sherwin Williams Master Hide, Sherwin Williams Stain Blocking Primer